Jeep Cherokee (XJ): Specifications

BATTERY

BATTERY

    Previous pageCleaning and inspection

    BATTERY The following information details the recommended cleaning and inspection procedures for the battery and related components. In addition to the maintenance schedules found in this service ...

    Other materials:

    Removal and installation
    Automatic shutdown (asd) relay The ASD relay is located in the Power Distribution Center (PDC) (Fig. 23). Refer to label on PDC cover for relay location. REMOVAL (1) Remove PDC cover. (2) Remove relay from PDC. (3) Check condition of relay terminals and PDC connector terminals for damage ...