Jeep Cherokee (XJ): Disassembly and assembly
Jeep Cherokee (XJ) 1984 - 2001 Service Manual > Transmission and transfer case > AW-4 automatic transmission > Disassembly and assembly
- Transmission
- Oil pump. Overdrive planetary gear and clutch. Overdrive support
- Direct clutch
- Forward clutch
- Front planetary gear. Sun gear and no. 1 one-way clutch. Second brake
- Planetary/brake pack/output shaft
- Transmission valve body
Park rod and pawl. Transmission throttle cable. Oil pump seal
Park rod and pawl
REMOVAL
(1) Remove valve body as outlined in this section.
(2) Remove bolts attaching park rod bracket to
case (Fig. 88).
(3) Remove park rod from manual valve shaft sector
...
DISASSEMBLY
(1) Remove torque converter.
(2) Remove clamps attaching wire harness and
throttle cable (Fig. 95) to transmission.
Fig. 95 Typical Harness And Cable Clamp Attachment
1 - CLAMP
...
Other materials:
Removal and installation
Overhead console
(1) Disconnect and isolate the battery negative
cable.
(2) Remove the two screws located forward of the
display module that secure the overhead console to
the upper windshield opening reinforcement (Fig. 3).
(3) To release the overhead console from the rear
mounting bracke ...

