Jeep Cherokee (XJ): Disassembly and assembly
Jeep Cherokee (XJ) 1984 - 2001 Service Manual > Transmission and transfer case > AW-4 automatic transmission > Disassembly and assembly
- Transmission
- Oil pump. Overdrive planetary gear and clutch. Overdrive support
- Direct clutch
- Forward clutch
- Front planetary gear. Sun gear and no. 1 one-way clutch. Second brake
- Planetary/brake pack/output shaft
- Transmission valve body
Park rod and pawl. Transmission throttle cable. Oil pump seal
Park rod and pawl
REMOVAL
(1) Remove valve body as outlined in this section.
(2) Remove bolts attaching park rod bracket to
case (Fig. 88).
(3) Remove park rod from manual valve shaft sector
...
DISASSEMBLY
(1) Remove torque converter.
(2) Remove clamps attaching wire harness and
throttle cable (Fig. 95) to transmission.
Fig. 95 Typical Harness And Cable Clamp Attachment
1 - CLAMP
...
Other materials:
Stationary glass. Description and operation. Removal and installation
Description and operation
WINDSHIELD SAFETY PRECAUTIONS
DESCRIPTION
WARNING: DO NOT OPERATE THE VEHICLE WITHIN 24 HOURS OF WINDSHIELD INSTALLATION.
IT TAKES AT LEAST 24 HOURS FOR URETHANE ADHESIVE TO CURE. IF IT IS NOT CURED, THE WINDSHIELD MAY NOT PERFORM PROPERLY IN AN ACCIDENT.
URETHANE AD ...

