Jeep Cherokee (XJ): NV242 transfer case

Previous pageAdjustments. Specifications. Special tools

Adjustments SHIFT LINKAGE ADJUSTMENT (1) Shift transfer case into 4L position. (2) Raise vehicle. (3) Loosen lock bolt on adjusting trunnion (Fig. 87). (4) Be sure linkage rod slides free ...

Next pageDescription and operation. Diagnosis and testing. Removal and installation

Description and operation NV242 transfer case DESCRIPTION The NV242 is a full-time transfer case (Fig. 1). It provides full time 2-wheel, or 4-wheel drive operation. A differential in the transfe ...

Other materials:

Road tire installation
1. Mount the road tire on the axle. 2. Install the remaining wheel bolts with the threaded end of the wheel bolt toward the wheel. Lightly tighten the wheel bolts. WARNING! To avoid the risk of forcing the vehicle off the jack, do not tighten the lug nuts fully until the vehicle has been lo ...